Question 11 of 12
A, B and C together can finish a job in 5 days. A alone takes 10 days and B alone takes 15 days. If they are paid 1,200 in total in proportion to the work done, how much does C receive?
- A 150
- B 300
- C 200
- D 240
C. 200
Step 1: A + B per day = 1/10 + 1/15 = 1/6
→ Step 2: C per day = 1/5 − 1/6 = 1/30
→ Step 3: C's share of the work = (1/30) ÷ (1/5) = 1/6
→ Step 4: C's pay = 1,200 × 1/6 = 200
→ Answer: 200